City Projects

 

Active Projects

4th Ave Full Street Reconstruction

Project Update

The Contractor will pave the street from 10th Street intersection to 11th Street intersection with concrete this week. Coloured boulevard will also be paved this week. All concrete work is expected to be completed this week.

Project Objectives

  • Full reconstruct of 4th Avenue (from 9th Street to 11th Street).
  • Improve street surface conditions.
  • Replace deteriorating utility infrastructure.
  • Enhance the downtown corridor streetscape.

Proposed Improvements – Reconstruction

  • Replace all storm sewer, water and sanitary sewer mains and services.
  • Construct a new concrete street.
  • Construct concrete sidewalks with colored treatments.
  • Pedestrian bump-outs at intersections.
  • New ornamental street lighting.

Project Area



  • Phase 2 – 2025 – 4th Avenue

Project-Area-Map.pdf(PDF, 4MB)

Project-Area-Map.jpg


Pavement Restoration

Project Updates

The first lift of bituminous pavement will be done on all affected streets by Tuesday. Once all the castings are adjusted, the second lift of bituminous will be poured

Project Objectives

Improvement of road surface; replacement of some outdated underground utilities

Proposed Improvement

Remove and replace bituminous pavement; remove and replace some storm structures and pipes; remove and replace a sanitary manhole and pipes

Project Area

Pershing Boulevard, Liberty Drive, Betty Avenue, Godfrey Street, Leon Avenue, Grandview Street

Pavement-Restoration.png


Centennial Trail Reconstruction

Project Updates

Complete and open for pedestrians 

Project Objectives

Improvement of trail surface and ADA conditions

Proposed Improvement

Remove and replace bituminous surface with concrete surface; install ADA-abiding sidewalk

 Project Area

Centennial Park (Splash Pad area) to Cynthia Avenue

Centenial1.png

Centenial3.png Centenial2.png

East 9th Ave Recon Main at 11th St

Project Updates

All is complete. Street is open to traffic.

Project Objectives

Improvement of road surface; replacement of some outdated underground utilities

Proposed Improvement

Remove and replace bituminous pavement; install new water main pipes; remove and replace sanitary main and service pipes

Project Area

E 9th Avenue from 10th Street to 11th Street

East-9th.png

Murray Avenue Street Reconstruction

Project Updates

Open to traffic

Proposed Improvement

Remove and replace the existing bituminous pavement with new pavement; remove and replace certain storm structures and pipes; and remove and replace a sanitary structure.

Project Area

Sherwood Street to the end of Murray Avenue


Murray-Ave.png

6th Avenue Water and Sanitary Sewer Reconstruction

Project Updates

The Contractor is continuing with water services at  14th Street and 6th Avenue intersection and will proceed through 14th Street this week. 6th Avenue intends to be temporarily paved by the end of the week if the weather permits.

Project Objectives

Replacement of certain outdated underground utilities

Proposed Improvement

Remove and replace the water main, service pipes, and structures; remove and replace the sanitary main and service pipes

Project Area

6th Avenue from 11th Street to 14th Street


6th-ave.png

Ray Drive

Project Updates

Completed and will be open to traffic soon.

Project Objectives

Improvement of the road surface, accessibility to surrounding commercial properties, and pedestrian traffic safety.

Proposed Improvement

Remove and replace existing pavement with concrete pavement;  install new driveways and sidewalk

Project Area

Ray Drive North Extension

 

Ray-Drive.png


Service Road and Service Drive Improvements

Project Updates 

Service Road is intended to have curb poured this week. Contractors will also begin storm work on Service Drive this week.


Project Objectives

Improvement of pavement and road accessibility; replacement of outdated underground utilities


Proposed Improvement

Remove and replace existing pavement with concrete pavement; extend both streets to T.H. 60; reconstruct underground public utilities, including storm main, water main and services, and sanitary main and services. Structures will also be replaced.


Project Area

Service Drive and Service Road.

Service-Road-and-Service-Drive-Improvements.png

E Flower Lane

Project Updates

The Contractor will complete water main work and start storm work this week. 

Objective:

This projects will construct a new street to provide access to upcoming developed lots and future commercial and industrial lots. In addition a pond will be constructed for detention of surface water, where the water quality will be treated. 

Proposed Improvements:

- Construct a new concrete street

- Construct a new water, sanitary and storm system which includes:

   - installation of 10” water main

   - installation of 8” sanitary main and services to upcoming developed lots. 

   - installation of 12” storm and construction of a pond. 

Flower-lane.jpg