4th Ave Full Street Reconstruction

Project Objectives

  • Full reconstruct of 4th Avenue (from 9th Street to 11th Street).
  • Improve street surface conditions.
  • Replace deteriorating utility infrastructure.
  • Enhance the downtown corridor streetscape.

Proposed Improvements – Reconstruction

  • Replace all storm sewer, water and sanitary sewer mains and services.
  • Construct a new concrete street.
  • Construct concrete sidewalks with colored treatments.
  • Pedestrian bump-outs at intersections.
  • New ornamental street lighting.

Project Area


  • Phase 2 – 2025 – 4th Avenue

Project-Area-Map.pdf(PDF, 4MB)

Project-Area-Map.jpg

 

Pavement Restoration

Project Objectives

Improvement of road surface; replacement of some outdated underground utilities

 

Proposed Improvement

Remove and replace bituminous pavement; remove and replace some storm structures and pipes; remove and replace a sanitary manhole and pipes

 

Project Area

Pershing Boulevard, Liberty Drive, Betty Avenue, Godfrey Street, Leon Avenue, Grandview Street

Pavement-Restoration.png

 

Centennial Trail Reconstruction

Project Objectives

Improvement of trail surface and ADA conditions

 

Proposed Improvement

Remove and replace bituminous surface with concrete surface; install ADA-abiding sidewalk

 

Project Area

Centennial Park (Splash Pad area) to Cynthia Avenue

Centenial1.png

Centenial3.png Centenial2.png

East 9th Ave Recon Main at 11th St

Project Objectives

Improvement of road surface; replacement of some outdated underground utilities

 

Proposed Improvement

Remove and replace bituminous pavement; install new water main pipes; remove and replace sanitary main and service pipes

 

Project Area

E 9th Avenue from 10th Street to 11th Street

East-9th.png

Murray Avenue Street Reconstruction

Project Objectives

Improvement of road surface; replacement of some outdated underground utilities

 

Proposed Improvement

Remove and replace the existing bituminous pavement with new pavement; remove and replace certain storm structures and pipes; and remove and replace a sanitary structure.

 

Project Area

Sherwood Street to the end of Murray Avenue

 

Murray-Ave.png

6th Avenue Water and Sanitary Sewer Reconstruction

Project Objectives

Replacement of certain outdated underground utilities

 

Proposed Improvement

Remove and replace the water main, service pipes, and structures; remove and replace the sanitary main and service pipes

 

Project Area

6th Avenue from 11th Street to 14th Street

 